Office Refurbishment Infrastructure for Lawfront, Colchester
Lawfront refurbished its 6,000 sq ft office in Colchester to create a modern, secure and well-connected workplace for a growing legal practice.
Scotech delivered the infrastructure as a single contractor: electrical works, structured cabling, Paxton10 access control, CCTV, an intruder alarm, ventilation changes and display installations across three floors.
The Challenge
The refurbishment brought several building services together in a live commercial environment, all working to the wider refurbishment programme alongside other contractors.
Key objectives included:
- Power and network connections for a large open-plan office
- Flexibility for future partition walls and furniture layouts
- Structured cabling to support data, voice, Wi-Fi and CCTV
- Secure access control across three floors
- High-definition CCTV and an intruder alarm
- Ventilation changes for the new meeting room layouts
- Display screens throughout the office
The Solution
Electrical Installation
A complete small power installation was carried out to support the new desk layouts and workplace facilities. The work included:
- Power supplies to every desk location, delivered through new floor boxes
- Cleaner’s sockets throughout the building
- Additional power supplies for the air conditioning
- Rewiring and modification of existing circuits
- Distribution boards upgraded with Type 2 surge protection devices
- Power arranged to suit future partition walls and furniture layouts
Structured Cabling
A high-capacity structured cabling network was installed throughout the building:
- 234 Category 6 data cables
- 16 Category 6A cables for high-performance Wi-Fi
- 208 network outlets via floor boxes
- 14 CCTV outlets
- 7 TV display outlets
- 8 Wi-Fi access point connections
A dedicated riser was created between the ground, first and second floors, so all cabling terminates in the central server room. Every penetration was fire sealed on completion to maintain fire compartmentation.
Access Control
A Paxton10 access control system now controls six key doors: the main entrance, two first-floor doors and three second-floor doors.
All controllers sit in the server room on UPS-backed power, which simplifies maintenance and improves resilience. Interface cabling was also run between reception and the server room, ready for future integration with the building’s fire alarm system.
CCTV
An IP CCTV system with eight 8MP Hikvision cameras covers the reception areas, stairwells, foyers and server room, with external coverage outside the building. The cameras use DarkFighter low-light technology and the system can be monitored remotely.
Ventilation Changes
The new meeting room layouts needed changes to the existing ventilation. Air conditioning grilles were relocated, ductwork routes modified and airflow redistributed, so every new meeting space has suitable ventilation and comfort.
Display Installations
Seven customer-supplied screens were mounted on commercial-grade brackets in meeting rooms and communal areas, each with integrated data and power.
Intruder Alarm
A Texecom Premier Elite intruder alarm provides out-of-hours security, with scope to integrate with the wider security systems.
The Results
- A fully connected workplace: power and data at every desk, with capacity for future change.
- A secure building: access control, high-definition CCTV and an intruder alarm working together.
- Comfortable meeting rooms: ventilation adjusted to suit the new layout.
- Modern collaboration spaces: displays installed and connected throughout.
- One contractor: a single point of contact across every discipline, with less contractor management for the client.
What the Client Said
“The quality of the work was to a very high standard, deadlines were consistently met, and the level of support and communication throughout the project was first class.”
Richard Palmer, Google review
Outcome
Lawfront now has a modern, secure and fully connected office in Colchester, built to support the practice as it grows.
Planning a refurbishment of your own? Read our guide to office refurbishment cabling and Wi-Fi.
Electrical Installation
Desk power via floor boxes, surge protection and circuits ready for future layouts.
Structured Cabling
234 Cat6 and 16 Cat6A cables, 208 floor box outlets and a new riser across three floors.
Paxton10 Access Control
Six controlled doors, with controllers centralised on UPS-backed power.
HD CCTV
Eight 8MP Hikvision cameras with low-light performance and remote monitoring.
Display Installations
Seven screens mounted and connected in meeting rooms and communal areas.
Intruder Alarm
A Texecom Premier Elite system for out-of-hours security.
Project at a Glance
- Client: Lawfront
- Project location: Colchester, Essex
- Office size: 6,000 sq ft over three floors
- Project type: Office refurbishment, single-contractor infrastructure
- Data cabling: 234 x Cat6 and 16 x Cat6A cables, 208 floor box outlets
- Other outlets: 14 CCTV, 7 TV display and 8 Wi-Fi access point connections
- Access control: Paxton10 on 6 doors
- CCTV: 8 x 8MP Hikvision cameras
- Intruder alarm: Texecom Premier Elite